Caspian Petrochemical Complex
Локация
Atyrau, Kazakhstan
Заказчик
National Petrochemical Company (CMS placeholder)
Тип контракта
EPC
Статус
Завершён
Завершение
2022
Обзор проекта
Grassroots polyethylene production complex including process units, utilities, offsites, product handling and a 110 kV substation.
Объём работ
EPC for process units, 38 km of interconnecting pipe racks, heavy lifts up to 1,200 t, commissioning support.
Инженерный вызов
Winter concreting at −35°C and logistics of oversized modules across 2,400 km of inland transport.
Решение Sayın
Enclosed heated batching, modular construction strategy and route-surveyed heavy transport engineering.