Capital Metro Line Extension
Capital Metro Line Extension

Локация

Doha, Qatar

Заказчик

National Rail Authority (CMS placeholder)

Тип контракта

Design & Build

Статус

В работе

Завершение

2029

Обзор проекта

11.2 km twin-bore metro extension with six underground stations, delivered with two EPB TBMs and full BIM-based design coordination.

Объём работ

TBM tunneling, station boxes, MEP, trackwork interface and systems integration support.

Инженерный вызов

Tunneling beneath live urban infrastructure with millimetric settlement tolerances.

Решение Sayın

Real-time TBM telemetry, compensation grouting arrays and a federated BIM model for clash-free delivery.