Location
Jubail, Saudi Arabia
Client
National Power Utility (CMS placeholder)
Contract Type
EPC Turnkey
Status
Ongoing
Completion
2027
Project Overview
A 1,900 MW combined-cycle gas turbine power plant delivered on a full EPC basis, including balance of plant, seawater cooling intake, 380 kV GIS switchyard and grid interconnection.
Scope of Work
Engineering, procurement, construction, commissioning and performance testing of three power blocks; heavy civil works; marine intake/outfall; HV transmission interface.
Engineering Challenge
Executing heavy lifts and precision turbine alignment in 50°C ambient conditions while maintaining an accelerated 42-month schedule across 6,000+ multinational workforce.
Sayın Solution
4D BIM-integrated planning, modular pre-assembly of pipe racks, night-shift concrete strategy and digital progress monitoring reduced critical-path risk and kept the program 6 weeks ahead.