Capital Metro Line Extension
Lieu
Doha, Qatar
Client
National Rail Authority (CMS placeholder)
Type de contrat
Design & Build
Statut
En cours
Achèvement
2029
Aperçu du projet
11.2 km twin-bore metro extension with six underground stations, delivered with two EPB TBMs and full BIM-based design coordination.
Périmètre des travaux
TBM tunneling, station boxes, MEP, trackwork interface and systems integration support.
Défi d'ingénierie
Tunneling beneath live urban infrastructure with millimetric settlement tolerances.
Solution Sayın
Real-time TBM telemetry, compensation grouting arrays and a federated BIM model for clash-free delivery.
