North–South Expressway Corridor
الموقع
Cairo — Alexandria, Egypt
العميل
National Roads Authority (CMS placeholder)
نوع العقد
Unit Price Contract
الحالة
مكتمل
الإنجاز
2023
نظرة عامة على المشروع
128 km dual-carriageway expressway with 14 interchanges, 62 structures and full ITS and tolling systems.
نطاق الأعمال
Earthworks, pavement, structures, electromechanical, tolling and traffic management during staged openings.
التحدي الهندسي
Maintaining traffic on the country's busiest corridor during staged construction.
حل ساين
Night possession strategy, mobile batching plants and GPS machine control for earthworks productivity.
